THE MAIN IDEA WAS TO PICK A HIGH VALUE SPOT FOR THE CENTRAL FACILITIES. THIS SPOT WAS FOUND TO BE ELEVATED CENTRAL POINT. FROM THAT POINT THREE LINEAR STRUCTURES WERE ALLOCATED FLANKING EXISTING STRUCTURES TO EXTEND THEM AND COMMUNICATE WITH THEM STRONGLY.